Methodology of Tower Construction
- Design of tower according to the technical data provided by client
- Approval of design / drawings from client
- Procurement of material according to the approved design, drawing and specification
- Material testing from KSEW Laboratory
- Inspection and approval of material from concerned authorities
- Welder and welding procedure qualification
- Fabrication of tower parts according to approved fabrication drawings and specification
- Trial assembly of tower parts
- Hot dip galvanization of fabricated parts
- Inspection and packing of material for transportation
- Transportation of material equipment and tools to site
- Material unloading at site and stacking according to part number and sizes
- Erection of tower main structure rest platforms, ladder, hand rail and other accessories
- Tightening of bolts and nuts according to required torque
- Inspection of tower before painting
- Painting of tower according to specifications
- Installation of electric cable, tower light & lightening protector etc.
- Final inspection of tower and handing over to client